Explore
Drag
Mute
Back to Home
1
2
3
4
5
6
FPJD ARCH THE CUBE 0382
Dubai
Architect
Yabu Pushelberg
Location
Dubai, UAE
Typology
Commercial
Year
2016
General Contractor
Seele GmbH

"I have been working with Spearhead for over twenty years. The nature of our collaborations, which involve the simultaneous consideration of craft, fabrication, assembly, design, and structural analysis, has come to epitomize for me the ideal design process, and I use their example repeatedly in public presentations promoting effective design. It does not hurt that the combination of their technical mastery with personal good humor has made those collaborations not only the most effective of my career, but also the most enjoyable."

Gregory R. Kingsley, PhD
President and CEO at KL&A Engineers and Builders

24
FPJD ARCH THE CUBE 0382
Strategic Partners
KL&A Engineers & Builders
Spearhead Team
Geoff Watts, Project Manager
Geoff Lucas, Fabrication Lead
P1030759

Spearhead took on the roles of design partner, specialty fabricator, and installer for this distinctive freeform sculpture in Dubai. Given the project's unique design complexity and location, the structure stands as a masterclass in freeform timber fabrication and logistics coordination.

FPJD ARCH THE CUBE 0383
Dubai 11 8
22
FPJD LS THE CUBE 02 4653
IMG 3363
5 11
FPJD LS THE CUBE 05 5149
October 2015 8
5 13
FPJD ARCH THE CUBE 0320